型號: | THS0842EVM |
廠商: | Texas Instruments, Inc. |
英文描述: | THS0842EVM(THS0842評估板) |
中文描述: | THS0842EVM(THS0842評估板) |
文件頁數(shù): | 16/37頁 |
文件大小: | 516K |
代理商: | THS0842EVM |
相關(guān)PDF資料 |
PDF描述 |
---|---|
THS10064EVM | THS10064 Evaluation Module(THS10064評估模塊) |
THS1040IDWR | 3-V, 10-BIT , 40-MSPS CMOS ANALOG TO DIGITAL CONVERTER |
THS1040CDWR | LABELS,CABLE MARKERS,CABLE MARKERS,LABELS, CABLE MARKERS,WIRE IDENTIFICATION AND MARKING SYSTEMS,SCOTCHCODE? WIRE MARKER TAPE REFILLS RoHS Compliant: Yes |
THS1040CPWR | TAPE,SCOTCHCODE? WIRE MARKER TAPE REFILLS FOR WIRE MARKER TAPE DISPENSER,TAPE,SCOTCHCODE SDR WIRE MARKER TAPE REFILL A" RoHS Compliant: Yes |
THS1206EVM | THS1206 Evaluation Module(THS1206評估板) |
相關(guān)代理商/技術(shù)參數(shù) |
參數(shù)描述 |
---|---|
THS0842IPFB | 功能描述:模數(shù)轉(zhuǎn)換器 - ADC 8-Bit 40MSPS Dual Ch RoHS:否 制造商:Texas Instruments 通道數(shù)量:2 結(jié)構(gòu):Sigma-Delta 轉(zhuǎn)換速率:125 SPs to 8 KSPs 分辨率:24 bit 輸入類型:Differential 信噪比:107 dB 接口類型:SPI 工作電源電壓:1.7 V to 3.6 V, 2.7 V to 5.25 V 最大工作溫度:+ 85 C 安裝風(fēng)格:SMD/SMT 封裝 / 箱體:VQFN-32 |
THS0842IPFBG4 | 功能描述:模數(shù)轉(zhuǎn)換器 - ADC 8-Bit 40MSPS Dual Ch RoHS:否 制造商:Texas Instruments 通道數(shù)量:2 結(jié)構(gòu):Sigma-Delta 轉(zhuǎn)換速率:125 SPs to 8 KSPs 分辨率:24 bit 輸入類型:Differential 信噪比:107 dB 接口類型:SPI 工作電源電壓:1.7 V to 3.6 V, 2.7 V to 5.25 V 最大工作溫度:+ 85 C 安裝風(fēng)格:SMD/SMT 封裝 / 箱體:VQFN-32 |
THS0842PFB | 制造商:TI 制造商全稱:Texas Instruments 功能描述:DUAL-INPUT, 8-BIT, 40 MSPS LOW-POWER ANALOG-TO-DIGITAL CONVERTER WITH SINGLE OR DUAL PARALLEL BUS OUTPUT |
THS10 | 制造商:未知廠家 制造商全稱:未知廠家 功能描述:EURO TERMINAL BLOCKS |
THS10064 | 制造商:TI 制造商全稱:Texas Instruments 功能描述:10-BIT 6 MSPS, SIMULTANEOUS SAMPLING ANALOG-TO-DIGITAL CONVERTER |