
ISP Interface Module Version 1.00 27/06/01
39
9.4.3 EQTools Project / Script Implementation
In order for the PPM to automatically detect the Target System Vcc Voltage, it is necessary to
set up a Programming Project and Script within EQTools as follows:
9.4.3.1 EQTools – Programming Project Setup
The EQTools project must be set up as follows:
i.
Set up so that the PPM Powers the Target System/Interface Module
ii. Set up the target power supply voltage to +5V and set the current to eg. 100mA
iii. Measure and set up the ‘Target Connect’ and ‘Target Disconnect’ voltages for your
Target System
iv. Enable ‘Detect Target Connect’ and ‘Detect Target Disconnect’ on the <Entry/Exit> tab of
your Programming Project.
9.4.3.2 EQTools – Script File Setup
The EQTools Script File must be set up as follows:
i.
In the <Base Project> and <Target Autoprogram1> tabs, select the required
Programming Project which you have just created
ii. In the <Target Connection and Disconnection> tab, select
‘PPM Auto-connect -> PPM
Auto-disconnect’
9.4.4 Running the Script/Project Files
Once you have created the require Programming Project and Script File, these can then be
tested with EQTools or ISP-PRO as follows:
i.
Make sure the Target System is NOT connected to the programmer
ii. Run the Script File
à
The Connect Icon should appear.
iii. Connect the Target System to the PIM
iv. Switch on the external Target Power Supply
à
The PPM should detect the presence of the Target Vcc Voltage and the icon should
change to the ‘Auto-Program’ icon.
v. When the programming sequence is complete (PASS or FAIL), either the PASS or FAIL
DISCONNECT icons will be displayed.
vi. Switch off the external Target Power Supply
à
The PPM should detect the absence of the Target Vcc and the <Connect> icon should
reappear.
vii. Remove the Target System